Reference List (Under Construction)
Oil & Gas
Infrastructure and Hospitality
Airports and Traffic Control
Reference List for Construction & Industries
2018-2019:
Engineering Services Warehouse [OCI]
2018:
Eitat [ECS]
57357 [Delta]
Huhtamaki [Korra Energi]
Al-Azhar Mosque [Al-Marasem]
2017:
Delta Project [Delta Construction]
Egyptian Army Conference Hall [OCI]
Date : (2017).
Project Name: Army Terminal West Building.
Contractor : OCI.
Date : (2016).
Project Name: Azhar University.
Contractor : Al-Marasem Company.
Date : (2016).
Project Name: Bonjorno Factory.
Contractor : LEEDS Company.
Date : (2016).
Project Name: Egyptian Army Conference Hall.
Contractor : OCI.
Date : (2016).
Project Name: Dar Al Handasah New Premises MEP & Finishes - Smart Village.
Contractor : OCI.
Date : (2016).
Project Name: Al-Araby Mall.
Contractor : Consukorra Company.
Date : (2015-2016).
Project Name: بانوراما الجبل الاخضر .
Contractor : Arab Contractors المقاولون العرب .
Date : (2015).
Project Name: UNB Bank Head Quarter – El Mohandessein.
Contractor : 2 Wires Company.
Date : (2015).
Project Name: The Administrative Building of the Ministry of Interior Police Academy.
Contractor : OCI.
Date : (2015).
Project Name: Hurghada International AirPort-BU.
Contractor : Al-Marasem Company.
Date : (2014-2015).
Project Name: Hurghada International AirPort Development Plan & Airfield & Arpon Design.
Contractor : OCI.
Date : (2014).
Project Name: New Premises (MEP & Finishes) in Cairo.
Contractor : OCI.
Date : (2014).
2013:
Giza North Station [OCI]
Infrastructure Smart Village Ph.2 [OCI]
2012:
Casual Dinning Room [Enco]
Kidzania [Mivan]
Dar Al-Handsa [OCI]
Infrastructure Smart Village Ph.2 [OCI]
Unicharm [Siac] 2011- 2012
AUG [Proservice] 2011- 2012
2011:
Giza North Station [OCI]
National Theater [Beltagiens]
NBD- Omar Makram [Conserv]
Piraeus Bank [Conserv]
Hanimax [DETAC] 2010 - 2011
Tanta Hospital 57357 [OCI] 2010- 2011
P&G [OCI] 2010 -2011
2010:
Housing & Development Bank [Arab Contractors]
Terga Power Plant – ALGERIA [Orascom Construction Industries (OCI)]
ABC [2 Wire]
Nile University [Delta]
Commercial Chambers [DETAC]
Sphinx- Smart Village [ORASCOM]
Misr for Centeral Clearing Despostiory [Orascom Construction Industries (OCI)]
Mall of Africa [Orascom Construction Industries (OCI) JV Allam Sons]
National Archives [REDECON] 2009-2010
New LNG Skikda ALGERIA [Orascom Construction Industries (OCI)]
Amwal Al-Arabia (DETAC) 2009-2010
Factory 27 – Abu Zaabal [The Arab Contractors Company] 2009-2010
Future Pharma (ABB Automation and Power Systems) 2009-2010
Future Pharma [ABB Automation and Power Systems] 2009-2010
2009:
Alexandria City Center Extension (Carrefour) [SIAC]
TE-data [SIAC]
Sphinx Building [Orascom Construction Industries (OCI)]
EASTERN Company (Borg El-Arab) Alexandria [DETAC]
Infra Structure Smart Village PH2 [ORASCOM]
Le Meridien Pyramids Hotel [ENCO]
Naeem Office Building [DETAC]
Housing & Development Bank [Arab Contractors] 2008-2009
Terga Power Plant – ALGERIA [Orascom Construction Industries (OCI).
Alexandria City Center Extension (Carrefour) [SIAC]
TE-data [SIAC]
Sphinx Building [Orascom Construction Industries (OCI)]
EASTERN Company (Borg El-Arab) Alexandria [DETAC]
Infra Structure Smart Village PH2 [ORASCOM]
Le Meridien Pyramids Hotel [ENCO]
Naeem Office Building [DETAC]
Housing & Development Bank [Arab Contractors] 2008-2009
Alexandria City Center Extension (Carrefour) [Delta Construction] 2008-2009
2008:
Alexandria City Center Extension (Carrefour) [SIAC]
Housing & Development Bank [Arab Contractors]
Misr for Centeral Clearing Depository [Orascom Construction Industries (OCI)]
2007:
Factory 27 – Abu Zaabal [The Arab Contractors Company]
Petrosport Station Phase (2) [ABB Arab] 2007 - 2008
AMARCO Project [Amarco Company Ltd.]
2006:
EMAAR [United Company Ltd.]
HEDCO Project [Hedco Company Ltd.]
El-Mokatam Project [United Engineers for Trading & Contracting (YMCO)]
Petrosport Station Phase (1) [ABB Arab]
Japanese Embassy [Huyandie] 2005 - 2006
Yassmin Water Station [Arab Contracting Company] 2005 - 2006
2005:
Vodafone Building [The Technical Office for Contracting]
2003:
Nile City [ORASCOM – B6]
Nile City [ORASCOM – B6]
2002:
Nile City [Orascom]
Nile Hilton Halls Revamp.
Ministry of Education [ABB Arab]
Dar El-Mona Hospital [Ginza]
El-Shiekh Zayed Hospital [Arab Contractors]
Ezz Steel Factory Al Ain Al Sokhna [Siac] 2001-2002
North El-Sokhna Terminals [Orascom] 2001-2002
2001:
Golf Club –Mirage City Project [Electrical Engineering Office]
El-Shiekh Zayed Hospital [ABB Contracting (Abacon)]
Sipes Factory [ABB Arab]
International Medical Center [ABB Arab]
USAID New Offices Building [ABB Susa-]
El-Shiekh Zayed Hospital. [ABB Contracting (Abacon)]
Honeywell Sweets Factory.
Arkadia Tower Project [ABB Contracting (Abacon)] 1999-2001
2000:
Mariout Fish Farm [ABB Industrial]
Citro Misr Factory 10th of Ramadan City [ABB Contracting (Abacon)]
EL-Nasr Co. For Coke.
TRD Project
National Defense Organization 1998-2000
Dar El-Hilal New Press 6th of October City [Dar El-Hilal Establishment]
Alexandria Petroleum Co [ABB Arab]
Oreintal Resort Project [ABB Contracting (Abacon)]
Swissotel Sharm El-Shiekh [Cairomatic]
American University in Cairo Academic Center Project. (AUC) [Orascom]
El-Fatim Shop [ABB Contracting (Abacon)]
AL Bardi Factory for paper industries. (Fine) 1998-2000
1999:
Cinema Lido – Cairo.
10th of Ramadan for printing.
International Hospital for Eye Surgeries [Siac]
Link Egypt.
Nile-Sat project [Arabian international construction]
Sheraton Laundry Project [EL-Salam office for contracting]
Daewoo Factory Project, 10th of Ramadan City [Nap Contract]
Nesco Village –Sharm El-Shikh [Nile Aster]
Sasco For Albums 1997-1999
1998:
Speed Control and soft-starting system for water treatment station for Grand Hotel, Hurgada.
Jacob Delafon Co.
General Lithograph Co.
European Egyptian Pharmaceutical Plant [Megicon]
British Embassy Project [Balfor Beaty]
Egyptian Bottling and Canning Factory 6th of October City [Megicon] 1996-1998
Egyptian Bottling and Canning Factory 6th of October City [Megicon] 1996-1998
Egyptian Bottling and Canning Factory 6th of October City [Megicon] 1996-1998
1997:
Abu-El-Feda Residential Tower.
ABB Head Quarter Building [ABB Contracting (Abacon]
Pyramids for electronic Instruments.
Egybel For Alumenium.
Abu-Tartor Project [North Upper Egypt Electrical Distribution]
Medical Refills.
A-Wayler & Farid For Pumps.
SEVECO.
1996:
Water and irrigation stations 10th of Ramadan city [Misr for Electromechanical project (KAHROMICA)]
Kiko
Alexandria Electrical Distribution Company
Torah Cement
Comet
Rotobac Factory
Water and irrigation stations 10th of Ramadan city [Misr for Electromechanical project (KAHROMICA)]
Kiko
Alexandria Electrical Distribution Company.
Reference List for Oil & Gas Sector
Construction and Industries
2018-2019:
Tender#521/2018/2019 [البتروكيماويات المصرية]
2018:
Western Desert - [ENPPI-BAPETCO]
Western Desert Complex-Alexandria [GASCO]
GASCO RFQ 1841/2018 [GASCO]
2017:
GASCO RFQ 652/2017 [GASCO]
2013:
AirCircuit Breaker, Salam Station [Khalda Petroleum Company]
Spare Parts [TechnoGroup]
C2&C3 Maximization Project , Spare Parts for existing System [Gasco]
Artificial Lift System Spare Parts [Al-Hamra Oil] 2012-2013
2012:
Existing System Spare Parts-Obaiyed Field [Badr Petroleum Company (BAPETCO)]
Vacum Circuit Breaker, Salam Station [Khalda Petroleum Company]
Saudi ARAMCO, Yanbu Expert Refinary, Dry Transformers [ENPPI] 2011-2012
Saudi ARAMCO, Yanbu Expert Refinary, Pad mounted Transformers [ENPPI] 2011-2012
Saudi ARAMCO, Yanbu Expert Refinary, LV Panels [ENPPI] 2011-2012
Saudi ARAMCO, Yanbu Expert Refinary, Cable Trays [ENPPI] 2011-2012
Saudi ARAMCO, Yanbu Expert Refinary, LV and MV Cable Bus [ENPPI] 2011-2012
Saudi ARAMCO, Yanbu Expert Refinary, MV Switchgear [ENPPI] 2009-2012
2011:
C2&C3 Maximization Project (Egyptian Natural Gas Co. GASCO) [ENPPI] 2010-2011
Amer 8 Platform and related Onshore & Offshore Facilities [ENPPI] 2009-2011
2010:
MCCB Feeder module-Obaiyed Field [Badr Petroleum Company (BAPETCO)]
Aeromat LV Air Circuit Breaker [Khalda Petroleum Company]
Auxilary Contact [Khalda Petroleum Company] 2009-2010
Extractor Fan [Badr Petroleum Company (BAPETCO)] 2009-2010
Spares Salam Gas Train 3&4 [Khalda Petroleum Company] 2009-2010
2009:
E-GAS Project [Petrojet South]
Spares Salam Gas Train 3&4 [Khalda Petroleum Company]
Spares – Obaiyed Field [Badr Petroleum Company (BAPETCO)]
Cubical Power Feeder C/W all acc. [Badr Petroleum Company (BAPETCO)]
Cut out For RFQ#11266/NSH [Khalda Petroleum Company]
Air Circuit Breaker For RFQ. # 9802/NSH [Khalda Petroleum Company] 2008-2009
Low Voltage Panel [Khalda Petroleum Company] 2008-2009
Fuse 2 Amp RFQ 10643NSH Tender MR 18949 [Khalda Petroleum Company] 2008-2009
2008:
Cut out For RFQ#10737/NSH [Khalda Petroleum Company]
Saudi ARAMCO, Expansion of HOUT Crude Onshore Production Facilities Project [ENPPI] 2007 - 2008
Saudi ARAMCO – Khafji Project [ENPPI] 2007-2008
Saudi ARAMCO, Safaniya Water Disposal System Upgrade Project [ENPPI] 2007-2008
Khalda Petroleum Company, Saban Site Train 3 & 4 [Petrofac] 2007-2008
Petrosport Station Phase (2) [ABB Arab] 2007 - 2008
Saudi ARAMCO, Safania Water Disposal System Upgrade Project [ENPPI] 2007 - 2008
Saudi ARAMCO, Khafji Project [ENPPI] 2007 - 2008
Saudi ARAMCO, KJO, Expension of HOUT Crude Onshore Production Facilities [ENPPI] 2007-2008
Saudi ARAMCO, Expansion of HOUT Crude Onshore Production Facilities Project [ENPPI] 2007-2008
Saudi ARAMCO, Safania Water Disposal System Upgrade Project [ENPPI] 2007-2008
Saudi ARAMCO, KJO Project [ENPPI] 2007-2008
Saudi ARAMCO, Expansion of HOUT Crude Onshore Production Facilities Project [ENPPI] 2007 - 2008
Saudi ARAMCO, Safania Water Disposal System Upgrade Project [ENPPI] 2007 - 2008
Saudi ARAMCO, Khafji Project [ENPPI] 2007 - 2008
Khalda Petroleum Company, Saban Site Train 3 & 4 [Petrofac] 2007-2008
Khalda Petroleum Co. (Salam Gas Station) Train 3 & 4 [PETROFAC] 2006 – 2008
2007:
Over Head Transmission Line Insulator For Khalda Petroleum (O.H.T.L.) [National Oil WellVarco PLH]
Saudi ARAMCO, Yanbu Project [ENPPI]
BAPETCO, Obayied Pre-Compression [ENPPI]
Petrojet Southen Branch (Bani Sweif Silos) [Petrojet]
Khalda Petroleum Co. Low Voltage Switch Rack [Khalda]
Petrojet Southen Branch [Petroje]
GASCO Project [Egyptian Natural Gas (GASCO)]
BAPETCO, Obayied Pre-Compression [ENPPI]
Agiba Project [Agiba Petroleum Company]
Natural Gas Co. GASCO Project [GASCO]
NEAG Multi Phase II Bapetco (BED – 3) Modifications [ENPPI] 2005 - 2007
2006:
Agiba Project [Agiba Petroleum Company]
Alexandria Carbon Black Company Control Panels [Alexandria Carbon Black Company]
Petrosport Station Phase (1) ABB Arab.
BAPETCO, Obayied Rectification Project [ENPPI] 2005 - 2006
BAPETCO, BED -15 Water Disposal Facility Project [ENPPI] 2005 - 2006
Bapetco, NEAG Multi Phase Pipeline to (BED – 3) [ENPPI] 2005 - 2006
Egyptian Natural Gas Co. GASCO [ENPPI] 2003-2006
2005:
General Petroleum Co. GPC. [EgyTec projects Co. Ltd.]
Petrojet East Branch Project [Petrojet]
Al-Salam Site Project [Khalda Petroleum Company]
Alexandria Carbon Black Company Revamp of line 2 [National Control Company NCC – EgyTec Projects Co. Ltd]
Alexandria Carbon Black Company Revamp of line 2 [National Control Company NCC – EgyTec Projects Co. Ltd.]
General Petroleum Company [GPC].
Petrojet East Branch Project [Petrojet]
General Petroleum Company (GPC).
Khalda Petroleum Company (Umbaraka – Al-Salam Villas) {Egyptian Construction and Trading Company] 2004 - 2005
Egyptian Natural Gas Company (Gasco) Extension Project [Egyptian Natural Gas Company (Gasco)] 2004 - 2005
Petrojet East Branch Project [Petrojet] 2004 - 2005
AFPC, Tanak / Omar Vapour Recovery & Tanak Water Injection in Syria. [ENPPI] 2002 - 2005
AFPC, Tanak / Omar Vapour Recovery & Tanak Water Injection in Syria [ENPPI] 2002-2005
2004:
General Petroleum Company [GPC]
Khalda Petroleum Company Al-Salam Site [Khalda Petroleum Company]
United Gas Derivatives Company UGDC, NGL project [Petrojet]
Cairo Oil Refining Company.
General Petroleum Company [GPC]
UGDC, NGL Project [Petrojet]
Alexandria Carbon Black Company Line 4 [National Control Company NCC]
Arab Organization for Industrialization A.O.I. [Arab Organization for Industrialization]
T.M.T Company Spare Parts [T.M.T.]
2003:
Egyptian Natural Gas Company (Gasco [EgyTec Projects.Co.Ltd.]
Zaafarana Field Submarine.
Modification on LV & MV Switchgear for Omar / Tanak Water Injection Project Al-Furat Petroleum Co. (AFPC); SYRIA [ENPPI] 2002-2003
DCS for Distributed Control System , F&G, ESD for Omar Tanak Al-Furat Petroleum Co. (AFPC); SYRIA [Enppi] 2002- 2003
2002:
Harmonic Analysis and Surge Suppression Panels [Khalda Petroleum Company ; Egypt]
TRD Project
2001:
Scada Satellite Network for Rosetta Gas Field Development project for Rasheed Petroleum Company (Rashpetco) Egypt [Enppi]
2000:
Saban / Jarnof Project & Azraq / Maleh Oil Expansiom Project for Al- Furat Petroleum Company (AFPC); SYRIA [Enppi]
Alexandria Petroleum Co. [ABB Arab]
LV & MV Switchgear, Motor Control Center, and Power Managemet System for the following sites of Khalda Petroleum Company South Om Baraka Site [Samsung, Korea] 1998-2000
1999:
LV & MV Switchgear, Motor Control Center, and Power Managemet System for the following sites of Khalda Petroleum Company Al-Salam Site [Samsung, Korea] 1998-1999
LV & MV Switchgear, Motor Control Center, and Power Managemet System for the following sites of Khalda Petroleum Company Tarek Site [Samsung, Korea] 1998-1999
Electrical Main Equipment for Western Desert Gas Development (Gasco) Project [Enppi] 1998-1999
1998:
Modularized Control Systems for Offshore Beds 2&3 [Badr Petroleum Company (Bapetco); Egypt 1992-1998
Supply of 11 KV Harmonic Filter [Egyptian Petrochemical Company (EPC)]
Abu-Tartor Project [North Upper Egypt Electrical Distribution]
MV & LV Switchboards & MCC for Offshore Beds 2&3 [Badr Petroleum Company (Bapetco); Egypt]1992-1998
1992:
Bapetco BED-2, Egypt [Shell International Petroleum Maatschappij]
Bapetco BED-3, Egypt [Shell International Petroleum Maatschappij]
Reference List For Airports and Traffic Control
Construction and Industries
Project Name : TB2 Multilateration Extension System Contract#7; Cairo International Airport.
Contractor : SAAB – EgyTec Projects Co. Ltd.
Date : 2015-2016.
Project Name : Multilateration SMR1,SMR2 & Data Fusion Desplay SMGC Contract#23; CIA.
Contractor : HITT – EgyTec Projects Co. Ltd.
Date : (2013-2014).
Project Name : Surface Movement Guidance Control Contract#3; Cairo International Airport.
Contractor : HITT – EgyTec Projects Co. Ltd.
Date : 2013.
Project Name : Vehicle Ground Transmitters (SQUIDs) – Phase 2; Cairo Airport.
Contractor : ERA – EgyTec Projects Co. Ltd.
Date : 2012.
Project Name : Multilateration Surveillance System - Cairo International Airport.
Contractor : HITT – EgyTec Projects Co. Ltd.
Date : 2010-2012.
Project Name : Surface Movement Guidance Control System (Spare Parts)
Contractor : HITT – EgyTec Projects Co. Ltd.
Date : 2008.
Project Name: Surface Movement Guidance Control System Extension (Phase 2) Tower III. Contractor : HITT – EgyTec Projects Co. Ltd.
Date : 2007-2010.
Project Name : Vehicle Ground Transmitters (SQUIDs) – Phase 1 – Cairo Airport.
Contractor : ERA – EgyTec Projects Co. Ltd.
Date : 2007.
Project Name : Surface Movement Guidance Control System Cairo SMGCS (Phase1).
Contractor : HITT – EgyTec Projects Co. Ltd.
Date : 2005-2008.
Project Name : Cairo Airport Terminal 1 Departure Hall 1 Upgrading
Contractor : The Technical Office for Contracting
Date : 2004.